Projects
Decades of projects delivered on time and on spec. Take a look at our recent work.
Projects We're Proud Of
LG Craven and Sons has completed drainage and underground service projects across the South West and regional Western Australia for over 50 years.
Below is a selection of our recently completed work, covering sewer, stormwater, and water main installations across private, commercial, and government contracts.
Recent Projects (Last 3 Years)
- Arawina Dalyallup
- Home HQ Busselton
- Airport Industrial Area Bunbury
- Witchcliffe Eco Village
- Spindrift Stages 1–4A
- Rapids Landing
- Leeuwin Stage 1–3
- Margaret River Main Street Upgrade
- In Town Cowaramup
Water Main Projects
- 4.8km 100mm main — Mt Buller Dam.
- 3.2km Riverslea Stage 8 (100mm up to 250mm).
- 450m 375mm Water Corporation — Riverslea.
- Dunsborough Lakes Stages 1A, 1B, 14, 15, 16 — 3.5km of 100mm and 150mm mains.
Sewer and Stormwater Projects
- Connelly Road 4-Block Subdivision — Margaret River.
- 112-Block Subdivision OTAN Karratha — Pindan and Rio Tinto (2km sewer, 2km water, 2012).
- 30-Block South Headland Osprey Site — Georgiou and LandCorp (2013).
- Newman 1B — 62 Blocks, Tasman and LandCorp (2013).
- Newman 2B — 70 Blocks, Tasman and LandCorp, 6m deep plastic-lined manholes (2014, $1.3M).
- Newman Shire Stormwater Upgrade — Refuse site and commercial district
- Dunsborough Lakes Stages 1, 1A, 14, 15, 16 — 125 blocks, over 3km subsoil installed.
- Riverslea Stage 8 — 92 lots, 2km sewer and 1.8km stormwater up to 750mm with rain gardens and subsoil drainage.
Join the growing list of shires, developers and government bodies who trust LG Cravenand Sons to deliver quality underground service installation across Western Australia.